METHODOLOGY FOR REVIEW OF SAFETY MANUAL

 

METHODOLOGY FOR REVIEW OF SAFETY MANUAL

23/03/2024

1

Final

AM

SS

YSG

29/02/2022

0

Final

MK

RB

YSG

Date

Rev

Remarks / Revision Summary

Prepared

Checked

Approved

     

HSE RMSPL

REVISION RECORDS

DISCLAIMER

This methodology has been prepared on behalf of and for the exclusive use of M/s ___ and is subject to and issued in accordance with the contract between M/s ___ and HSE Risk Management Services Private Limited. HSE Risk Management Services Private Limited accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this Methodology by any third party.

Copying this Methodology without the permission of M/s ___ or HSE Risk Management Services Private Limited is not permitted.

Proposed Methodology

  1. Introduction
  2. The establishment and maintenance of a safe and healthy working environment is a requirement of any organization. The general Health and Safety Policy statement of the University must be supplemented therefore by detailed reference to our organization and the arrangements most likely to ensure the success of the Health and Safety Policy within the University.
  3. In the case of each of the defined sites/buildings used by the University, there has to be a clear statement of who is responsible for ensuring that satisfactory standards of health and safety are maintained.
  4. The Organizational Chart gives the details of the allocation of responsibility within the University. Staffs with specific health and safety supportive roles are also identified.
  5. The ‘Management Arrangements’ give the detailed procedures for implementing the policy across the whole range of our teaching, research and work activities. Where appropriate reference is made to other information on health and safety that is routinely made available to staff and students.
    1. Methodology
  6. Data Collection
  7. Preparation:-
  8. Review the list of safety procedure
  9. Review the existing procedure and find out the gap
  10. Review the list of all the safety procedures and Identifying the need for any additional safety procedures
  11. Updation of Safety Manual report and internal review
  12. Preparation of Draft report and submission to client
  13. Comments incorporation
  14. Final report submission
    1. Project Deliverables
    2. Table 1 Safety Manual

Sr. No.

Document Deliverable

  •  

Executive Summary

  •  

List of Documents Review

  •  

Submission of terms of reference

  •  

Safety Manual Methodology

  •  

Reference

  •  

List of tables

  •  

CHAPTER 01 GENERAL SAFETY RULES _ REGULATIONS

  •  

CHAPTER 02 SAFETY PROCEDURES

  •  

CHAPTER 03 OPERATIONS _ MAINTENANCE SAFETY

  •  

CHAPTER 04 ELECTRICAL SAFETY

  •  

CHAPTER 05 SAFETY RELATED TO CIVIL JOBS

  •  

CHAPTER 06 SAFETY IN SPECIFIC AREAS

  •  

CHAPTER 07 SAFE WORK ENVIRONMENT

  •  

CHAPTER 08 CHEMICAL SAFETY GUIDE

  •  

CHAPTER 09 FIRE PROTECTION SYSTEMS AT GSFC

  •  

CHAPTER 10 SAFETY APPLIANCES AND INSTRUMENTS

  •  

CHAPTER 11 ACCIDENT, INCIDENT REPORTING INVESTIGATION

  •  

CHAPTER 12 FIRST AID MEASURES

  •  

CHAPTER 13 EMERGENCY ACTION PLAN

  •  

CHAPTER 14 STATUTORY REGULATIONS

These chapters may contain the following topics depending up on the requirement of the project:-

1. CHAPTER 01 GENERAL SAFETY RULES _ REGULATIONS-

  • For Employees
  • For Contractor And Laborers
  • For Visitors

Chapter 02 Safety Procedures-

  1. Work Permit System
  2. Safety Tags And Locks
  3. Confined Space Entry Permit
  4. Hot Work Permit
  5. Line Breaking _ Vessel Opening Permit
  6. Permission To Start The Work In Plant
  7. Electrical Isolation Permit
  8. Temporary Electrical Supply
  9. Permit To Work On Electrical Distribution
  10. Tank Farm Entry Permit

Chapter 03 Operations _ Maintenance Safety-

  • Procedure For Isolation Of Safety Valves
  • Hydro-Jetting
  • Procedure For Preparation Of Equipment
  • Furnace And Flare Operation
  • Line Equipment Identification
  • Safety Appliances Fire Fighting Equipments Checking
  • Use Of Common Utilities And Temporary Hose Connection
  • Eye Wash-Showers Fire Sprinklers Checking
  • Shutdown Reminders
  • Safety In Machine Shop
  • Insulation On Pipe Lines Vessels
  • Mechanical Material Handling Equipments
  • Manual Material Handling Procedure
  • Specific Hot Works _ Safety Precautions
  • Online Repairs _ Clamping
  • Blinding _ Blanking
  • Welding _ Gas Cutting
  • Sampling, Draining And Venting
  • Work Involving Rotating Equipments
  • Working On Or Near Moving Or Running Machinery
  • Working With Cryogenic Fluids
  • Leakage _ Spillage Checking
  • Checks Before Taking Equipment In Line
  • Specific Hot Works _ Safety Precautions
  • Sampling, Draining And Venting
  • Procedure For Safety Valve Testing
  • Eye Wash-Showers _ Fire Sprinklers Checking
  • Tanker Farm Safety
  • Loading _ Unloading Of Chemicals
  • Procedure For Checking Trip System
  • Decoking Operation Of Pipe Lines _ Its Cleaning
  • Working With Gas Cylinders
  • Hand Tools And Portable Power Driven Tools
  • Checking Of Guards
  • Radioactive Sources
  • Mechanical System Safe Guards
  • Identification Of Openings _ Trench Covers
  • Drum Filling _ Handling
  • Operational System Safe Guards

Chapter 04 Electrical Safety-

  • Generators (Diesel Engine)
  • Transformers
  • Substations Panels
  • Lightning Protection
  • Switchyard
  • Overhead Transmission Lines
  • Electrical Area Classification,
  • Earthing of Electrical System
  • Power driven tools
  • Hazards Of Electricity
  • Temporary Electrical Power Supply
  • Safe Use Of Megger Test Lamp
  • Low Voltage Distribution System Installations
  • Protection Against Static Electricity
  • Electrical Cables
  • Batteries _ Battery Room

Chapter 05 Safety Related To Civil Jobs-

  • Design Criteria For Civil Structures
  • Working At Heights
  • Working On Roofs
  • Excavation Work(Pits Roads)
  • Painting Of Structures Buildings
  • Grit Blasting (Sand Blasting Is Not Permitted Now)
  • Accumulation Of Water In Drain Channels _ Its Cleaning
  • Demolition Of Structures _ Buildings
  • Water Proofing Using Hot Bitumen

Chapter 06 Safety In Specific Areas-

  • Chlorination At Cooling Towers
  • Safety In Warehouse
  • Safety In Laboratory
  • Safety On Road Rail At Gsfc
  • Safety Guidelines To Follow During Natural Disasters
  • Construction Safety

Chapter 07 Safe Work Environment-

  • Ventilation And Heat Control
  • Lighting And Color
  • Noise And Vibration Control
  • Good Housekeeping

Chapter 08 Chemical Safety Guide

  • Hazardous Chemicals
  • Dot Classification
  • Trem Card
  • Hazardous Properties Of The Chemicals
  • Material Safety Data Sheet (Msds)
  • Gsfc Chemical Safety Guide
  • Hazchem Panel

Chapter 09 Fire Protection Systems At Gsfc-

  • Sprinklers_Mv Spray System
  • Hydrocarbon Sensors
  • Fire Water System
  • Fire Detection System
  • Fire Alarm System
  • Fire Detection System
  • Portable Fire Extinguishers
  • Fundamentals Of Fire,
  • CO2 SYSTEM
  • DELUGE WATER FOAM SYSTEM (DWFS)
  • STEAM BLANKETING
  • HALON SYSTEM
  • FIXED FOAM INSTALLATIONS
  • PORTABLE FIRE EXTINGUISHERS
  • FUNDAMENTALS OF FIRE

Chapter 10 Safety Appliances And Instruments

  • Safety Instruments
  • Types Of Ppa
  • Safety Appliances_Instruments

Chapter 11 Accident, Incident Reporting Investigation-

  • Accident Investigation _ Recordkeeping
  • Accident. Incident, Near miss Reporting Procedures

Chapter 12 First Aid Measures

  • Gas Poisoning _ Asphyxiation
  • Burns
  • Electric Shock
  • Head Injury
  • Cuts Or Buries

Chapter 13 Emergency Action Plan-

  • Groupwise Emergency Action Plan
  • Supporting Information Thorough Annexures
  • Off-Site Emergency Plan
  • Communication Systems
  • Training, Rehearsal Records
  • Action On Site
  • Emergency Organization
  • Risk And Environment Impact Assessment
  • Objectives.

Chapter 14 Statutory Regulations

  • Civil Aviation Regulations
  • Poisons Act, 1919_Rules, 1984
  • The Indian Electricity Act, 1910_Rules, 1956-2002
  • Static And Mobile Pressure Vessels (Unfired)
  • Factories Act, 1948
  • Manufacture, Storage Import Of Hazardous Chemicals
  • Gas Cylinders Rules, 1981, 2002
  • The Petroleum Act, 1934 And The Petroleum Rules, 1976
  1. Guideline Used for Safety Manual Study
  2. Indian Standard Acts, Rules, and Regulations, or
  3. OSHA and NFPA Guidelines, or
  4. Any other Guideline as per clients’ requirement

    1. Software to be used
  5. Not applicable

About Yashpal singh

Mr. Yashpal Singh is the Managing Director and Process Safety Expert at HSE RMSPL. With 19 years of experience, he specializes in HAZOP, QRA, and functional safety engineering. He helps clients achieve safe, compliant operations while minimizing industrial risks and incidents.

Leave a Comment